top of page
Bachelor of Science (Honours) in Architecture
Building Technology 2 [ARC3523]
Project 1: Building Plan/ Fire-fighting Plan
Working Drawings are an integral part of the construction industry and the architect’s chief means of communication with the various levels of the authorities, clients and consultants. A comprehensive knowledge of the format and conventions of working drawings, as well as an overall awareness of its importance in practice is crucial for the student.
Project 1 requires to:
- Identify and select a project designed from Studio 5
- Translate the selected building into a cemplete set of architectural working drawing (for submission to the authorities), utilising all the formats and conventions of working drawing as they applied in contemporary architectural practice
- Research and establish a basic understanding of statutory requirements from the authorities and fire safety guidelines and to implement the requirements into the project
- Research and establish a basic understanding of the structural system, building services, materials and other relevant technology and to apply the understanding into the project
![]() OG SITE PLAN-1.jpg | ![]() OG GROUND FLOOR PLAN-1.jpg | ![]() OG 1ST FLOOR PLAN-1.jpg |
---|---|---|
![]() OG 2ND FLOOR PLAN-1.jpg | ![]() OG 3RD FLOOR PLAN-1.jpg | ![]() OG ROOF PLAN-1.jpg |
![]() SCHEDULE 1-1.jpg | ![]() SCHEDULE 2-1.jpg | ![]() SCHEDULE 3-1.jpg |
![]() SCHEDULE 4-1.jpg | ![]() SCHEDULE 5-1.jpg | ![]() SECTION A-A-1.jpg |
![]() SECTION B-B-1.jpg | ![]() BOMBA SITE PLAN-1.jpg | ![]() BOMBA GROUND FLOOR PLAN-1.jpg |
![]() BOMBA 1ST FLOOR PLAN-1.jpg | ![]() BOMBA 2ND FLOOR PLAN-1.jpg | ![]() BOMBA 3RD FLOOR PLAN-1.jpg |
![]() BOMBA ROOF PLAN-1.jpg | ![]() EXTERNAL FRONT ELEVATION-1.jpg | ![]() EXTERNAL REAR ELEVATION-1.jpg |
Project 2: Construction/ Technical Drawing
![]() 1.jpg | ![]() 2.jpg | ![]() 3.jpg |
---|---|---|
![]() 4.jpg | ![]() 5.jpg | ![]() 6.jpg |
bottom of page